• 6001 Broken Sound Pkwy NW
  • Suite 610
  • Boca Raton , FL 33487

News & Events

Degasifier and Clearwell Improvements

November 01, 2019

In 2014, an engineering consultant’s evaluation found that systems related to post-treatment of the reverse osmosis permeate at Water Treatment Plant (WTP) 11 needed modification in order to provide stable, high quality finished water. In response, Palm Beach County Water Utilities Department (PBC

Ground Water Rule Implementation

The City of Boynton Beach wanted to make chemical changes at the city’s West Water Treatment Plant (WTP) for two reasons: to provide 4-log virus treatment under the Ground Water Rule, and to reduce sulfuric acid usage. Globaltech provided consulting engineering and permitting assistance to meet th

Read More

Anion Exchange Color Removal System

Like many municipalities, the Town of Davie needed to take extra steps to produce crystal-clear drinking water, since color is naturally occurring in the Town’s groundwater source. Globaltech was selected as a design-build contractor to permit, design, construct and commission a 4 mgd color remova

Read More

Ground Storage Tank and Clearwell Addition

Lee County needed to increase detention time of chloramine-treated finished water at its Corkscrew Water Treatment Plant in order to meet CT disinfection requirements. The County’s Utilities Division chose Globaltech to design and implement the necessary water storage improvements. As part of the

Read More

Repump Modifications

In order to stabilize water quality in the western portion of its service area, the Riviera Beach Utility District hired Globaltech as a design-build company to upgrade the Avenue U Repump Station. The initial request was to replace the existing gas chlorine system at the repump station. However, af

Read More
[contact-form-7 id="5" title="Contact Us"]