• 6001 Broken Sound Pkwy NW
  • Suite 610
  • Boca Raton , FL 33487

News & Events

Margate Interconnect

November 01, 2019

With an eye toward emergency preparedness, the Coral Springs Improvement District (CSID) and its neighbor to the east, the City of Margate, agreed to construct a potable water interconnect. If an unforeseen event were to cut off drinking water to CSID customers, the interconnect would provide them w

Well 17W Rehabilitation

The City of Boca Raton sought to modify 25 of its raw water wells because the wells’ blow-off piping terminated directly into canals or storm drains and could become submerged when the canals or drains became full. The City also wanted to raise many of the well heads to bring them above the 100-ye

Read More

Booster Pump Station and 30-Inch Interconnect

Florida Power & Light needed to increase the amount of potable water supplied by Palm Beach County Water Utilities to its West County Energy Center to meet elevated demands and overcome pressure deficiencies. In order to achieve this, FP&L retained Globaltech to design and build a potable wa

Read More

Floridan Production Well No. 8

When additional raw water capacity was needed for the Lake Region Reverse Osmosis (RO) Water Treatment Plant, Globaltech, Inc. was selected to provide design-build services to install a new Floridan Aquifer Well that would meet the need. The project included health department permitting, building de

Read More

Wellfield Improvement Program

The Fort Pierce Utilities Authority (FPUA) maintains multiple raw water supply wellfields located throughout its service area and operates a combination of both surficial and Floridan aquifer wells connected by a network of raw water mains. In a continuing effort to improve the reliability and quant

Read More
[contact-form-7 id="5" title="Contact Us"]