News & Events

Gravity Thickener Mechanism Replacement

November 01, 2019

The rake arm mechanism inside the lime sludge gravity thickener tank at the Fort Pierce Utilities Authority (FPUA) water treatment plant (WTP) became inoperable and needed to be replaced. FPUA hired Globaltech under a continuing design-build services contract to replace the mechanism and implement s

Lime Softener Rehabilitation

Lime Softener No. 2 at Fort Pierce Utility Authority’s (FPUA) water treatment plant was nearly 35 years old and in need of significant rehabilitation. Globaltech had successfully refurbished the plant’s other lime softener (No. 1) two years earlier. With Softener No. 1 running at full capacity,

Read More

Elevated Water Tank

The elevated water storage tank for the Town of Mangonia Park was aging and deteriorated. Under a consent order issued by the Palm Beach County Health Department, the County’s Water Utilities Department contracted with Globaltech to replace the aging tank. As a design-build company, Globaltech per

Read More

Filter Media Replacement

The filter media in three filters at Water Treatment Plant 8 were more than 30 years old. Under Globaltech’s continuing services design-build contract with Palm Beach County Water Utilities Department, we were tasked with removing the old media (anthracite, sand, and gravel) and replacing it with

Read More

Lime Softener Repair and Replacement

The 10 MGD lime softening unit No. 1 at Fort Pierce Utility Authority’s (FPUA) water treatment plant was nearly 50 years old and in need of significant rehabilitation to place it back in operation. The plant was in a vulnerable position: with Softener No. 1 out of service, they could not shut down

Read More

Reverse Osmosis Plant Expansion

In the mid-2000s, the Fort Pierce Utilities Authority (FPUA) identified the need to expand the treatment capacity of its reverse osmosis (RO) water treatment plant in order to meet a projected increase in demand. Under a design-build continuing services contract with FPUA, Globaltech permitted, desi

Read More

Vacuum Filter Replacement

The Florida Keys Aqueduct Authority’s Dean Water Treatment Plant needed to replace its 25-year-old lime sludge dewatering vacuum filter without disturbing the existing structure in which it was housed. Globaltech was selected as a design-build company to perform the project. To prepare for the ins

Read More

Anion Exchange Color Removal System

Like many municipalities, the Town of Davie needed to take extra steps to produce crystal-clear drinking water, since color is naturally occurring in the Town’s groundwater source. Globaltech was selected as a design-build contractor to permit, design, construct and commission a 4 mgd color remova

Read More

Ground Storage Tank and Clearwell Addition

Lee County needed to increase detention time of chloramine-treated finished water at its Corkscrew Water Treatment Plant in order to meet CT disinfection requirements. The County’s Utilities Division chose Globaltech to design and implement the necessary water storage improvements. As part of the

Read More