Lift Station Improvements

Under a continuing design-build contract with Seacoast Utility Authority (SUA), Globaltech upgraded more than a dozen lift stations between 2015 and 2018, incorporating the latest SUA standards for functionality, reliability, and aesthetics.

Globaltech prepared engineering drawings, provided electrical specifications, obtained building and health department permits, constructed the improvements, and performed startup and commissioning of the new equipment.

Project Achievements / Benefits

Each lift station received a new stainless steel control panel with a Remote Telemetry Unit (RTU) panel containing a Programmable Logic Controller (PLC).

Other common scope items included:

  • Demolition and reconstruction of concrete maintenance pads
  • New FP&L meter cans
  • New antennas, masts, and/or towers
  • Landscaping/fencing upgrades